Honors College and Residences Construction Time-Lapse

10.4231/R7JQ0Z0F

Andrew Sydelko, Chris Teague, Darcy M. Bullock, Deborah Horton, Katie Hendryx, Shawn Robertson, Wayne A. Bunnell

09/15/2016

Construction on the Honors College and Residences began on January 5, 2015, and the building opened for occupancy fall 2016. The 320,000-square-foot facility houses over 800 residents and has more than 40,000 square feet dedicated to academics. The Hon...

Civil Engineering Construction construction time-lapse Honors College Honors College and Residences Honors College Hall Purdue Honors College time-lapse

Construction Time-Lapse of Mechanically Stabilized Earth Walls

10.4231/R7BK199R

Darcy M. Bullock, Drake W. Krohn, Wayne A. Bunnell

04/12/2016

This video documents the construction process on six different Mechanically Stabilized Earth walls throughout the 2015 construction season. The MSE walls are located on US 31 between Carmel and Westfield, as part of the project to upgrade the existing...

Building Construction Management Civil Engineering Construction Construction Engineering and Management mechanically stabilized earth wall MSE wall retaining wall time-lapse

Construction of Sinusoidal Rumble Strips

10.4231/R76H4FPJ

Andrew Balmos, Dana Plattner, Darcy M. Bullock, James Krogmeier, Jijo Mathew

07/16/2018

This video documents the construction of sinusoidal rumble strips on IN 1, near Fort Wayne, IN.

Civil Engineering Construction Rumble Strips Safety Sinusoidal

PIM Tool Instructional Video: Getting Started with the Graphical Measurement Tool

10.4231/R7ZK5DV8

Ali Lenjani, Chul Min Yeum, Shirley J. Dyke

11/13/2017

Accurate and safe measurement of actual pay items placed is a critical step in the timely completion of a construction project. Currently this is an entirely manual process, with substantial risk to personnel as well as for human error. Thus, the abili...

Civil Engineering Construction image processing pay items

PIM Tool Instructional Video: Getting Started with the Orthophoto Tool

10.4231/R7TT4P4Z

Ali Lenjani, Chul Min Yeum, Shirley J. Dyke

11/13/2017

Accurate and safe measurement of actual pay items placed is a critical step in the timely completion of a construction project. Currently this is an entirely manual process, with substantial risk to personnel as well as for human error. Thus, the abili...

Civil Engineering Construction image processing pay items

PIM Tool Instructional Video: Getting Started Guide to Taking Aerial Images

10.4231/R73B5XBK

Ali Lenjani, Chul Min Yeum, Shirley J. Dyke

11/13/2017

Accurate and safe measurement of actual pay items placed is a critical step in the timely completion of a construction project. Currently this is an entirely manual process, with substantial risk to personnel as well as for human error. Thus, the abili...

Civil Engineering Construction image processing pay items

Invariant Signatures of Architecture, Engineering, and Construction (AEC) Objects in Industry Foundation Classes (IFC)-based Building Information Modeling

10.4231/7VW7-0129

Jiansong Zhang, Jin Wu

07/23/2021

The invariant signature of an architecture, engineering, and construction (AEC) object is defined as "a set of intrinsic properties of the object that distinguish it from others and that do not change with data schema, software implementation, modeling dec...

Architecture Engineering and Construction (AEC) Objects Building Construction Management Building Information Modelling (BIM) Construction Construction Engineering and Management Construction Management Technology Industry Foundation Classes (IFC)

Display #

Results 1 - 7 of 7