Datasets

subject: diverging diamond interchange creator: Alexander M. Hainen

Total is 2 Results
Arrival Performance Measures at a Diverging Diamond Interchange

10.4231/R7057CVS

Alexander M. Hainen , Darcy M. Bullock ORCID logo , Jamie Mackey , Mark Taylor

03/10/2014

This video shows several cycles of a diverging diamond interchange at SR-201 / Bangerter in Salt Lake City, Utah on December 18, 2013.

Civil Engineering diverging diamond interchange offset pitcher performance measures traffic signal

Three-Phase Operations at a Diverging Diamond Interchange Using an Unmanned Aerial Vehicle (UAV) Camera

10.4231/R7C24TC4

Alexander M. Hainen , Amanda Stevens , Darcy M. Bullock ORCID logo , Howell Li

07/24/2014

This video shows three-phase operations featuring a hold-back phase with data characterizing the southbound internal through movement (OL-C) on May 15, 2014, at the SR-201 / Bangerter DDI in Salt Lake City, Utah.

Civil Engineering diverging diamond interchange drone operation signal traffic UAV Unmanned Aerial Vehicle

Display #

Results 1 - 2 of 2