creator: Darcy M. Bullock, 0000-0002-7365-1918 creator: Amanda Stevens date: 2014
10.4231/R7VD6WCH
Alexander M. Hainen , Amanda Stevens , Darcy M. Bullock , Howell Li
03/10/2014
This video demonstrates the optimized performance at a diamond interchange at I-69 / 96th Street in northeast Indianapolis, IN.
Civil Engineering diamond interchange offset optimization sequence signal
10.4231/R7C24TC4
Alexander M. Hainen , Amanda Stevens , Darcy M. Bullock , Howell Li
07/24/2014
This video shows three-phase operations featuring a hold-back phase with data characterizing the southbound internal through movement (OL-C) on May 15, 2014, at the SR-201 / Bangerter DDI in Salt Lake City, Utah.
Civil Engineering diverging diamond interchange drone operation signal traffic UAV Unmanned Aerial Vehicle
Display #
Results 1 - 2 of 2