Datasets

creator: Darcy M. Bullock, 0000-0002-7365-1918 creator: Wayne A. Bunnell

Total is 32 Results
Old Indiana State Road 1 Bridge Demolition, February 17, 2016

10.4231/R7348H97

Darcy M. Bullock ORCID logo , Drake W. Krohn , Wayne A. Bunnell

04/12/2016

The Whitewater steel truss bridge was built in 1913 but had been closed to traffic since 1999. This video was shot using remote cameras deployed by the Joint Transportation Research Program to document the bridge demolition.

Civil Engineering Old Indiana State Road 1 steel bridge demolition

Old Indiana State Road 1 Bridge Demolition, February 17, 2016

10.4231/R7DJ5CKZ

Darcy M. Bullock ORCID logo , Drake Krohn , Wayne A. Bunnell

04/08/2016

The Whitewater steel truss bridge was built in 1913 but had been closed to traffic since 1999. This video was shot using remote cameras deployed by the Joint Transportation Research Program to document the bridge demolition.

Civil Engineering Old Indiana State Road 1 steel bridge demolition

Disassembly of Boeing 727 N180FE at Purdue Airport

10.4231/R7P55KFB

Betty M. Stansbury , Colin D. Furr , Darcy M. Bullock ORCID logo , Wayne A. Bunnell

09/15/2015

This video provides a time lapse documentation of the disassembly and removal of a Boeing 727 at the Purdue Airport (KLAF) between August 4 and August 12, 2015

aircraft disassembly Aviation Technology Boeing 727 Civil Engineering N180FE Purdue University Airport

Evaluation of MARWIS for Indiana Winter Road Operations

10.4231/R7222RRP

Darcy M. Bullock ORCID logo , Drake W. Krohn , Jijo K. Mathew ORCID logo , Lucy M. Richardson , Margaret L. McNamara , Michelle M. Mekker , Wayne A. Bunnell

01/25/2017

This video documents the evaluation of the MARWIS data sensors as performed by Purdue University’s CE 597 class.

Civil Engineering MARWIS winter road operations winter weather sensors

Bridge Beam Placement US 31 and 169th Street

10.4231/R7542KK0

Darcy M. Bullock ORCID logo , Drake W. Krohn , Stephen M. Remias , Wayne A. Bunnell

11/18/2016

This video documents the construction of the northbound bridge of US 31 over 169th Street in Westfield, Indiana, as the beams are placed.

bridge beam placement bridge beam time-lapse bridge construction Civil Engineering construction time-lapse

Bridge Deck Construction Time-Lapse

10.4231/R7WM1BCC

Darcy M. Bullock ORCID logo , Drake W. Krohn , Stephen M. Remias , Wayne A. Bunnell

11/18/2016

This video documents the construction of the bridge deck on US 31 near I-465 in Carmel, Indiana.

bridge deck construction bridge deck time-lapse Civil Engineering concrete bridge deck construction time-lapse

Display #

Results 1 - 10 of 32