subject: Civil Engineering creator: Darcy M. Bullock, 0000-0002-7365-1918 date: 2014
10.4231/R76D5QXB
Darcy M. Bullock , Stephen Remias , Teresa Morris
10/07/2014
The video corresponds with the delay performance measure in the 2013–2014 Indiana Mobility Report.
Civil Engineering congestion delay mobility performance measures
10.4231/R72N506D
Darcy M. Bullock , Edward Cox , Stephen Remias , Teresa Morris
10/07/2014
A time-lapse summary of a 3-day snow event northeast of Indianapolis, Indiana, from January 2014.
10.4231/R7XW4GQQ
Darcy M. Bullock , Nathan Riggs , Steve Lavrenz , Teresa Morris
10/07/2014
This time-lapse video includes highlights of the I-65/I-70 Interstate reconstruction project that took place last September–October, 2013.
bridges Civil Engineering Construction Engineering and Management Indianapolis INDOT Interstate 65 Interstate 70 Purdue University South Split
10.4231/R7T43R0Q
Darcy M. Bullock , Nathan Riggs , Steve Lavrenz , Teresa Morris
10/07/2014
This time-lapse video depicts the replacement of the Virginia Avenue beams as part of the South Split reconstruction.
bridges Civil Engineering Construction Engineering and Management Indianapolis INDOT Interstate 65 Interstate 70 Purdue University South Split
10.4231/R7VX0DFH
Alexander M. Hainen , Andrew Sydelko , Darcy M. Bullock , David Burford , Michael Witt
11/21/2014
Two iconic buildings on the Purdue University campus, the Engineering Administration Building and the retired Heating and Power Plant-North, were targeted for demolition in 2012 to make way for the construction of the Active Learning Center.
Active Learning Center Building Construction Management building demolition Civil Engineering Construction Engineering and Management ENAD Demolition ENADALC Engineering Administration Building Heat and Power Plant-North Purdue University
10.4231/R7MG7MDJ
Alexander M. Hainen , Andrew Sydelko , Darcy M. Bullock , David Burford , Michael Witt
11/21/2014
Two iconic buildings on the Purdue University campus, the Engineering Administration Building and the retired Heating and Power Plant-North, were targeted for demolition in 2012 to make way for the construction of the Active Learning Center.
Active Learning Center Building Construction Management building demolition Civil Engineering Construction Engineering and Management ENAD Demolition ENADALC Engineering Administration Building Heat and Power Plant-North Purdue University
10.4231/R7GQ6VPT
Christopher Day , Darcy M. Bullock
11/20/2014
This animation illustrates the use of the Link Pivot algorithm for optimizing offsets on a signalized arterial.
Civil Engineering Computer Science optimization traffic engineering traffic signal timing traffic signals
10.4231/R7057CVS
Alexander M. Hainen , Darcy M. Bullock , Jamie Mackey , Mark Taylor
03/10/2014
This video shows several cycles of a diverging diamond interchange at SR-201 / Bangerter in Salt Lake City, Utah on December 18, 2013.
Civil Engineering diverging diamond interchange offset pitcher performance measures traffic signal
10.4231/R7VD6WCH
Alexander M. Hainen , Amanda Stevens , Darcy M. Bullock , Howell Li
03/10/2014
This video demonstrates the optimized performance at a diamond interchange at I-69 / 96th Street in northeast Indianapolis, IN.
Civil Engineering diamond interchange offset optimization sequence signal
10.4231/R7ZW1HV3
Darcy M. Bullock , Teresa Morris
08/08/2014
This video highlights research completed by the Joint Transportation Research Program led by Darcy Bullock, Lyles School of Civil Engineering, Purdue University, for JTRP Project SPR-3528, "Alternatives to Raised Pavement Markers (RPMs)."
Civil Engineering pavement alternatives RPM rumble stripes SPR-3528
Display #