Datasets

creator: Wayne A. Bunnell date: 2016

Total is 20 Results
Sagamore Bridge Crossover Construction

10.4231/R7445JFM

Darcy M. Bullock ORCID logo , Drake W. Krohn , Wayne A. Bunnell

11/18/2016

This video documents the construction of the crossover for the Sagamore Parkway bridge reconstruction project.

Civil Engineering crossover construction crossover time-lapse Sagamore Parkway bridge US 52 bridge US 52 bridge crossover Wabash River bridge crossover

Sidewalk Construction 116th Street and US 31

10.4231/R7VM498F

Darcy M. Bullock ORCID logo , Drake W. Krohn , Wayne A. Bunnell

11/18/2016

This video documents the construction of sidewalk construction at the intersection of US 31 and 116th Street in Carmel, Indiana.

116th Street sidewalk Civil Engineering sidewalk construction sidewalk time-lapse

Truck Apron Construction US 31 and 106th Street

10.4231/R7M61H71

Darcy M. Bullock ORCID logo , Drake W. Krohn , Wayne A. Bunnell

11/18/2016

This video documents the construction of a concrete truck apron at the intersection of US 31 and 106th Street in Carmel, Indiana.

Civil Engineering roundabout truck apron roundabout truck apron construction truck apron construction truck apron time-lapse

Underdrain Installation Time-Lapse

10.4231/R7GF0RGV

Darcy M. Bullock ORCID logo , Drake W. Krohn , Stephen M. Remias , Wayne A. Bunnell

11/18/2016

This video documents the construction of underdrains on US 31 near State Road 32 in Westfield, Indiana.

Civil Engineering construction time-lapse road underdrain underdrain construction underdrain construction time-lapse

Wilmeth Active Learning Center Building Construction Time-Lapse, August 2014–September 2016

10.4231/R75B00D1

Alexander M. Hainen , Andrew Sydelko , Darcy M. Bullock ORCID logo , David Burford , Deborah Horton , Katie R. Hendryx , Michael Witt ORCID logo , Teresa Walker , Wayne A. Bunnell

10/28/2016

This video documents the demolition of the Engineering Administration building (ENAD) and the old Heat and Power Plant–North (HPN) building and the construction of the new Wilmeth Active Learning Center.

Active Learning Center construction Civil Engineering JTRP time-lapse WALC Wilmeth Active Learning Center

Bridge Beam Placement US 31 and 169th Street

10.4231/R7542KK0

Darcy M. Bullock ORCID logo , Drake W. Krohn , Stephen M. Remias , Wayne A. Bunnell

11/18/2016

This video documents the construction of the northbound bridge of US 31 over 169th Street in Westfield, Indiana, as the beams are placed.

bridge beam placement bridge beam time-lapse bridge construction Civil Engineering construction time-lapse

Display #

Results 1 - 10 of 20