Datasets

creator: Wayne A. Bunnell type: dataset date: 2017

Total is 7 Results
Evaluation of MARWIS for Indiana Winter Road Operations

10.4231/R7222RRP

Darcy M. Bullock ORCID logo , Drake W. Krohn , Jijo K. Mathew ORCID logo , Lucy M. Richardson , Margaret L. McNamara , Michelle M. Mekker , Wayne A. Bunnell

01/25/2017

This video documents the evaluation of the MARWIS data sensors as performed by Purdue University’s CE 597 class.

Civil Engineering MARWIS winter road operations winter weather sensors

I-69 and Campus Parkway Bridge Beam Placement, March 2, 2017

10.4231/R7WD3XKS

Darcy M. Bullock ORCID logo , Kyle Van Meter , Nathan Riggs , Wayne A. Bunnell

04/11/2017

This video documents the placement of steel beams to widen Campus Parkway over I-69 in Noblesville, Indiana.

bridge construction Campus Parkway bridge Campus Parkway bridge beam placement Civil Engineering construction time-lapse

Sagamore Parkway Bridge Pier No. 2 Pile Driving, December 2016

10.4231/R7MW2F5K

Darcy M. Bullock ORCID logo , Drake W. Krohn , Wayne A. Bunnell

04/11/2017

This video documents the placement of piles for the footing of Pier No. 2 for the replacement Sagamore Parkway bridge for eastbound traffic.

bridge replacement Civil Engineering construction time-lapse pile driving Sagamore Parkway bridge

Display #

Results 1 - 7 of 7