Datasets

subject: Civil Engineering subject: Sagamore Parkway bridge creator: Wayne A. Bunnell

Total is 2 Results
Sagamore Parkway Bridge Pier No. 2 Pile Driving, December 2016

10.4231/R7MW2F5K

Darcy M. Bullock ORCID logo , Drake W. Krohn , Wayne A. Bunnell

04/11/2017

This video documents the placement of piles for the footing of Pier No. 2 for the replacement Sagamore Parkway bridge for eastbound traffic.

bridge replacement Civil Engineering construction time-lapse pile driving Sagamore Parkway bridge

Sagamore Bridge Crossover Construction

10.4231/R7445JFM

Darcy M. Bullock ORCID logo , Drake W. Krohn , Wayne A. Bunnell

11/18/2016

This video documents the construction of the crossover for the Sagamore Parkway bridge reconstruction project.

Civil Engineering crossover construction crossover time-lapse Sagamore Parkway bridge US 52 bridge US 52 bridge crossover Wabash River bridge crossover

Display #

Results 1 - 2 of 2