creator: Nathan Riggs creator: Darcy M. Bullock, 0000-0002-7365-1918
10.4231/R7XW4GQQ
Darcy M. Bullock , Nathan Riggs , Steve Lavrenz , Teresa Morris
10/07/2014
This time-lapse video includes highlights of the I-65/I-70 Interstate reconstruction project that took place last September–October, 2013.
bridges Civil Engineering Construction Engineering and Management Indianapolis INDOT Interstate 65 Interstate 70 Purdue University South Split
10.4231/R7T43R0Q
Darcy M. Bullock , Nathan Riggs , Steve Lavrenz , Teresa Morris
10/07/2014
This time-lapse video depicts the replacement of the Virginia Avenue beams as part of the South Split reconstruction.
bridges Civil Engineering Construction Engineering and Management Indianapolis INDOT Interstate 65 Interstate 70 Purdue University South Split
10.4231/R7WD3XKS
Darcy M. Bullock , Kyle Van Meter , Nathan Riggs , Wayne A. Bunnell
04/11/2017
This video documents the placement of steel beams to widen Campus Parkway over I-69 in Noblesville, Indiana.
bridge construction Campus Parkway bridge Campus Parkway bridge beam placement Civil Engineering construction time-lapse
Display #
Results 1 - 3 of 3