subject: diverging diamond interchange creator: Darcy M. Bullock, 0000-0002-7365-1918
10.4231/R7C24TC4
Alexander M. Hainen , Amanda Stevens , Darcy M. Bullock , Howell Li
07/24/2014
This video shows three-phase operations featuring a hold-back phase with data characterizing the southbound internal through movement (OL-C) on May 15, 2014, at the SR-201 / Bangerter DDI in Salt Lake City, Utah.
Civil Engineering diverging diamond interchange drone operation signal traffic UAV Unmanned Aerial Vehicle
10.4231/R7057CVS
Alexander M. Hainen , Darcy M. Bullock , Jamie Mackey , Mark Taylor
03/10/2014
This video shows several cycles of a diverging diamond interchange at SR-201 / Bangerter in Salt Lake City, Utah on December 18, 2013.
Civil Engineering diverging diamond interchange offset pitcher performance measures traffic signal
Display #
Results 1 - 2 of 2