subject: drone subject: signal date: 2014
10.4231/R7C24TC4
Alexander M. Hainen , Amanda Stevens , Darcy M. Bullock , Howell Li
07/24/2014
This video shows three-phase operations featuring a hold-back phase with data characterizing the southbound internal through movement (OL-C) on May 15, 2014, at the SR-201 / Bangerter DDI in Salt Lake City, Utah.
Civil Engineering diverging diamond interchange drone operation signal traffic UAV Unmanned Aerial Vehicle
Display #
Results 1 - 1 of 1