Datasets

subject: construction time-lapse date: 2016

Total is 14 Results
Bridge Beam Placement US 31 and 169th Street

10.4231/R7542KK0

Darcy M. Bullock, 0000-0002-7365-1918, Drake W. Krohn, Stephen M. Remias, Wayne A. Bunnell

11/18/2016

This video documents the construction of the northbound bridge of US 31 over 169th Street in Westfield, Indiana, as the beams are placed.

bridge beam placement bridge beam time-lapse bridge construction Civil Engineering construction time-lapse

Bridge in a Minute

10.4231/R7N58JBD

Darcy M. Bullock, 0000-0002-7365-1918, Drake W. Krohn, Stephen M. Remias, Wayne A. Bunnell

11/18/2016

This video documents the construction of the northbound bridge of US 31 over 169th Street in Westfield, Indiana.

bridge construction bridge in a minute bridge time-lapse Civil Engineering construction time-lapse

Roundabout in a Minute

10.4231/R77W6951

Darcy M. Bullock, 0000-0002-7365-1918, Drake W. Krohn, Stephen M. Remias, Wayne A. Bunnell

11/18/2016

This video documents the construction of the interchange roundabout at US 31 and 191st Street in Westfield, Indiana.

Civil Engineering construction time-lapse roundabout construction roundabout in a minute roundabout time-lapse

Purdue University Buildings Demolition, Construction Images, November 2016, POTR Building Camera 1

10.4231/R7513W5P

Alexander M. Hainen, Andrew T. Sydelko, Darcy M. Bullock, 0000-0002-7365-1918, David Burford, Michael Witt, 0000-0003-4221-7956

12/09/2016

Two iconic buildings on the Purdue University campus, the Engineering Administration Building and the retired Heating and Power Plant-North, were targeted for demolition in 2012 to make way for the construction of the Wilmeth Active Learning Center.

Active Learning Center construction building construction Building Construction Management Civil Engineering construction time-lapse ENADALC Purdue University WALC Wilmeth Active Learning Center

Display #

Results 1 - 10 of 14