Datasets

subject: Civil Engineering subject: JTRP

Total is 39 Results
Intelligent Snow Plow: Integrated Connected Vehicle Data and INDOT Snowplow 63550 Telematics Feed from February 15-16, 2021, Winter Storm

10.4231/V572-YX70

Darcy M. Bullock ORCID logo , Howell Li , Jairaj Desai , Justin Mahlberg , Woosung Kim

06/09/2021

This video explains and illustrates the integration of an INDOT plow truck dashboard camera with floating car data obtained from connected vehicles.

Civil Engineering Indiana JTRP roads snow plow Winter De-Icing winter road operations

Intelligent Snow Plow: Integrated Connected Vehicle Data and INDOT Traffic Camera Feed from February 15-16, 2021, Winter Storm

10.4231/SFMN-R881

Darcy M. Bullock ORCID logo , Howell Li , Jairaj Desai , Justin Mahlberg , Woosung Kim

06/09/2021

This video explains and illustrates the integration of an INDOT traffic camera with floating car data obtained from connected vehicles.

Civil Engineering Indiana JTRP roads snow plow Winter De-Icing winter road operations

Salt Stockpile Inventory - January 24 to 27, 2023- INDOT Lebanon Salt Facility

10.4231/4MAG-JN90

Ayman F Habib ORCID logo , Darcy M. Bullock ORCID logo , Greg Brinster , Haydn A Malackowski , Justin Mahlberg , Mina Joseph , Raja Manish , Yerassyl Koshan

05/15/2023

This visualization shows RGB images, LiDAR images and estimated volume of the salt stockpile at the INDOT Lebanon Salt Facility throughout a winter storm.

Civil Engineering JTRP LiDAR management salt stockpile Weather Winter Operations

Salt Stockpile Inventory – May 1st -10th 2023 – INDOT Lebanon Salt Facility Post-Winter Refill

10.4231/CBH3-3019

Ayman F Habib ORCID logo , Christopher Gartner , Darcy M. Bullock ORCID logo , Haydn Malackowski , Justin Mahlberg , Mina Joseph , Raja Manish , Yerassyl Koshan

07/25/2023

This visualization shows RGB images, LiDAR point clouds, and estimated volumes of the salt stockpile at the INDOT Lebanon Salt Facility as salt was delivered to refill the facility after the winter season.

Civil Engineering JTRP LiDAR salt stockpile Weather Winter Operations

Heavy Fleet and Facilities Optimization: Electronic Tool for Generating Optimal Snow Routes (Python Version)

10.4231/VCTK-A223

Ramanujam Ramaswamy ORCID logo , Richard Ajagu , Runjia Du , Sam Labi ORCID logo

10/03/2022

The Snow Route Generation tool helps INDOT’s winter operations personnel to generate snow removal routes in an optimal manner and minimize the deadhead miles of the trucks deployed in snow removal. The manual explains how to use the SRG tool.

Civil Engineering JTRP optimal snow routes python program snow removal Winter Operations

Applications of Production Vehicle Road Roughness Data Before and After Pavement Construction

10.4231/AQ5K-NR86

Darcy M. Bullock ORCID logo , Howell Li ORCID logo , Justin Mahlberg

10/05/2023

This visualization shows a synced view of a road improvement project before the project began and after. The video also displays the international roughness index value for each respective tenth mile before and after construction.

Civil Engineering connected vehicles evaluation International Roughness Index IRI JTRP management Pavement Pavement Quality

Display #

Results 1 - 10 of 39