subject: winter road operations
10.4231/XBET-8A88
Darcy M. Bullock
,
Jack Bell
,
Justin Mahlberg
,
Matthew Jewison
05/14/2021
Calibration of agency trucks could take upwards to 2 hours per vehicle if an agency must travel to have trucks weighed twice at offsite scales. The innovative volumetric based method allows calibration to be performed on-site and can be done in...
calibration Calibration Time-lapse Civil Engineering Indiana JTRP roads snow plow Volumetric Winter De-Icing winter road operations
10.4231/R3XJ-0875
Darcy M. Bullock
,
Howell Li
,
Jairaj Desai
,
Justin Mahlberg
,
Rahul Sakhare
,
Woosung Kim
05/14/2021
This visualization of storm activity is overlaid with telematics data from snow plow trucks.
Civil Engineering Indiana JTRP MRMS Forecast roads snow plow Winter De-Icing winter road operations Winter Storm Deployment Winter Storm Management
Display #
Results 1 - 10 of 22